Abstract: “Riachuelo - Lote 3” forms part of a massive hydraulic scheme being implemented in Buenos Aires to increase the sewage capacity of one of the biggest metropolitan areas worldwide. The overall scheme is intended to treat the wastewater and then discharge it into the “Rio de la Plata” river thereby relieving the “Riachuelo” river basin from its pollution. The project foresees the execution of a...
Abstract: The Interurban Train Line Toluca – Mexico crosses the mountain range of Las Cruces, which is part of the vast TransMexican Volcanic Belt, from east to west, with twin 4.7 km long tunnels, at depths from 15 to 136 m and with a slope of 4% in most of the alignment. Two 8.56 m. diameter EPB shields were used to bore the twin tunnels, facing the extremely complicated geology of the region composed...
Abstract: Backfill grouting is a specific item defined by the Customers in tunnelling works to obtain different goals. In between these goals, it is worth to consider the ground water control: to release the water table pressure acting against the precast segmental lining, the backfill grouting must be designed as a pervious material. The actual standard grouting mixes (pea gravel with cementitious...
Abstract: Within the context of “Radimero” TBM tunnels for "Terzo Valico dei Giovi" project, the high-speed rail between Genoa and Milan, geological formations containing Naturally Occurring Asbestos can be crossed. In these conditions, the limitation of dispersion of dust and, consequently, of fibres becomes very important for the TBM excavation process, especially during the transport of the excavated...
Abstract: During the tunnel excavation with EPB machines, the traditional mucking operations with horizontal belt conveyor is sometimes replaced by the use of piston pumps to move the muck from the TBM to the tunnel portal. When this mucking technique is selected, the soil conditioning plays a key role for the improving of the whole excavation process, giving the contractor several advantages in terms of...
Abstract: Mechanized tunneling operations require a high amount of water for different purposes. Most of the water is used for the cooling system of the TBM. Secondary uses of water are for the plants and machinery maintenance, segments intrados before assembly, mucking system and TBM shield cleaning. This secondary water is generally transported through a dewatering system up to a water treatment plant,...
Abstract: The Metro Line 2 of Warsaw is a urban underground railway, being part of the city’s strategy for sustainable transport. Its construction was awarded to a Joint Venture leaded by the Italian company ASTALDI S.p.A.. At the end of 2013 the J.V. successfully completed the construction of the two tunnels which represent the most interesting and challenging part of the project, with the use of 4 TBM...
Abstract: The main purpose of the twin tunnels of the Legacy Way project is to connect the western freeway at Twoowong with the inner City Bypass (ICB) at Kelvin Grove, providing an alternative route to local roads for traffic. The project was awarded to the Consortium Transcity, including the companies Acciona, BMD Constructions and Ghella, which used...