Search & filter
Search & filter
Application of Disc Cutter Real -time Diagnosis in Shantou Gulf Tunnel
ITA-AITES World Tunnel Congress, WTC2022 and 48th General Assembly Bella Center, Copenhagen 2 - 8 September 2022 Application of Disc Cutter Real-time Diagnosis in Shantou Gulf Tunnel X.L. Wei1, F.L. Lin1, X.B. Meng1, S.L. Zhou1, J.K. Guo1, H. Sun1 1 China Railway Engineering Equipment Co., Ltd. Zhengzhou, Henan, China E-mail: shijiesuidaodahui@163.com Abstract: Shantou Gulf Tunnel is constructed by large diameter slurry shield machine with accessible cutterhead. The geology of the whole drive is complex with boulders and protruding bedrock. Hence disc cutters are prone to be damaged, resulting in frequent cutter replacement. In order to accurately keep track of disc cutter status and improve the accuracy of manual sampling, a real-time disc cutter status diagnosis system suitable for accessible cutterhead is developed, as well as a tunnel face analysis technology which is based on disc cutter status monitoring. This paper describes in detail the disc cutter status detection device, and how to analyze the tunnel face geology according to the disc cutter status. Through the application in Shantou Gulf Tunnel, it is proved that the system can accurately recognize various failure forms of disc cutter, and analyze the geology of the tunnel face, so as to provide basis for disc cutter replacement and guidance for tunneling parameter optimization. Key Words: Shantou Gulf Tunnel; accessible cutterhead; disc cutter status diagnosis; tunnel face geology analysis [3]. In addition, the maximum water pressure of the project is close to 0.5 MPa, and the tunnel passes through extremely soft 1.Recipient :
* Required fields
or Cancel
Application_of_Disc_Cutter_Real_
H. Sun / X.l. Wei / F.l. Lin / X.b. Meng / S.l. Zhou / J.K. Guo
This product is no longer in stock
Availability date: