Search & filter
Search & filter
Fair and Transparent Payment for Excavation and Lining Works / How Bill of Quantities are Utilized according to the FIDIC Emerald Book
The FIDIC Emerald Book has been drafted with the aim of providing fair and balanced contracts for the underground industry. The excavation and lining works of a tunnel depend on the geological/geotechnical situation, which will be encountered during the execution. It is not possible to estimate the required quantities for the support beforehand and remuneration of the Contractor needs to be flexible to account for these uncertainties. In many tunnel contracts, it is a problem how cost for extension of time due to changed geology (or other circumstances not in the sphere of the Contractor) is compensated. It is a fact that the Contractor has higher costs when the execution of the project takes longer than indicated in the Contract and these costs should be paid to the Contractor. To facilitate these concepts the Emerald Book foresees different BoQ items for the excavation and lining works only, which cover Fixed-rate items, Timerelated items and Quantity-related items. All other parts shall be covered in lump sums.
Recipient :
* Required fields
or Cancel
id448
H. Ertl / M. Neuenschwander / J. Maclure
This product is no longer in stock
Availability date: