Search & filter
Search & filter
Abstract: Non-contact measurement systems allow measuring the layer thickness in near real-time without personnel entering the sprayed area. Two main questions must be answered on-site: Is there enough or even too much sprayed concrete applied on the tunnel wall? Applying the targeted layer thickness is important regarding the safety during the construction phase and the future stability of the concrete...
Abstract: On the Follo Line project in Oslo, currently Norway’s largest transport project, Amberg Technologies supports the construction with surveying systems, services and know-how for the drill and blast lot in Oslo. For the first time a new system was used which allows scanning, positioning and processing of point clouds close to real time. With the intuitive tablet software you can immediately...
Abstract: The Zhangjiajie-Jishou-Huaihua (hereinafter referred to as ZhangJiHuai) highspeed railway project has started its construction since 12th December 2016. The Jishou Tunnel, as an early start section and key control project of the line, first introduced tunnel scan system which has been widely used on the entire project. Tunnel scan system integrates 3D laser scanner and smart computer software,...