Search & filter
Search & filter
Abstract: RITES was given the consultancy services to design the slope protection works around the tunnel portal T77A-P1 in DharamQuaziqund section of the 345km long prestigious USBRL project in J&K, India, for the operational safety of the railway line. This portal is at mid height of the hill and is connected with a rail bridge to its immediate vicinity. The slopes around the portal are steep and...
Abstract: East Coast Zone of Indian Railway has planned 445km of additional railway line to support the transportation of metal ore and coal to major ports of east India along with movement of passenger traffic in state of Odisha. The project includes construction of more than 50 tunnels all with unique challenges. RITES Limited is awarded the work for preparing the Detailed Project Report for design of...