Search & filter
Search & filter
Abstract: The tunnels and the underground station of the Zurich Cross Rail can be characterized as extremely challenging and is at the limit of the technical feasibility. In tunnelling the growing complexity of technical problems as well as the high safety level required during construction call increasingly for a methodical procedure in the analysis and handling of risks. It is of vital interest that a...
Abstract: The Westlink is a commuter rail link in the central part of Gothenburg. It will improve the existing sack station to a through-station with connections to the existing railway lines. It is 8km long, comprising bridges, 6km of tunnels and three underground stations, lying in rock, clay and below ground water level. As an urban project it underpasses several roads, tramways, facilities and...