List of products by author: S. Călinescu

Showing 1 - 4 of 4 documents
  • Read more
    0,00 €

    Abstract: Bucharest City Metropolitan Area has in excess of 2,05 million people. In the prepara- tion of global development for Bucharest metro transport, the first step was the identification of methods of increasing the share of Bucharest metro transport system, for increase in performanc- es under the specific circumstances that the urban public transport involves. One of the main strategies which...

    0,00 €
  • Read more
    0,00 €

    Abstract: Construction of Metro line 4 began in 1989. Due to the lack of funds, in ’90 years, it was stopped for 8 years. Initially, it were provided 7 stations on a 6.5 km length of the line. The works restarted in 1998 and on the 1 of March, 2000, first section it was commissioned, having 3.36 km in length, with 4 stations: Gara de Nord 2, Basarab 2, Griviţa and 1 Mai. Following in time, on the 1 of...

    0,00 €
  • Read more
    0,00 €

    Abstract: The population of Bucharest City Metropolitan Area is currently exceeding 2,1 million. The first step in the preparation of Bucharest Metro Transport Global Development was to identify the methods of increasing the share of Bucharest metro transport system and its performance under the specific circumstances generated by urban public transport. The M6 metro line will connect Bucharest City with...

    0,00 €
  • Read more
    0,00 €

    Abstract: The population of Bucharest City Metropolitan Area is currently exceeding 2,1 million. The first step in the preparation of Bucharest Metro Transport Global Development was to identify the methods of increasing the share of Bucharest metro transport system and its performance under the specific circumstances generated by urban public transport. The M6 metro line will connect Bucharest City with...

    0,00 €