Förbifart Stockholm – Design of Tunnels under Road Lövstavägen
This paper provides a brief overview about the project Förbifart Stockholm and the situation where the two ramp tunnels 411 and 412 pass under the road Lövstavägen with very little cover. The paper is mainly focusing on the concept of the ground treatment from surface (jet grouting measures), the design of the primary ground support secondary lining. The analysis methods and the results are briefly discussed. Finally the planned monitoring program is outlined.
Recipient :
* Required fields
or Cancel
wtc2015_full_grossauer-1
B. Lindström / K. Grossauer / A. Gabrielsson