Search & filter
Search & filter
Geotechnical challenges during the execution of Bucharest 5 metro line
The route of the future 5 metro line crosses Bucharest city from West to East, subcrossing the historical city center, crowded by old buildings significantly impacted by earthquakes in 1940, 1977, 1986 and 1990. “The geotechnical challenges” caused by the complexity of the characteristic elements of the metro route test the knowledge of the designers of subway-related underground structures, which act in the field of geological engineering sciences, geotechnical sciences, buildings and construction equipment inclusively.Recipient :
* Required fields
or Cancel
pap370
V. Ciugudean-Toma / I. Stefanescu
This product is no longer in stock
Availability date: