Search & filter

Search for a publication

Search & filter

Year

Author

City

Country

Rock Tunnels at High Water Pressure Non -Continuous Pressurized Tunneling vs. Slurry Tunneling

Rock Tunnels at High Water Pressure Non -Continuous Pressurized Tunneling vs. Slurry Tunneling

Rock_Tunnels_at_High_Water_Press

B. Grothen / L. Home

The choice of TBM type is never easy, but it becomes especially challenging when faced with a hard rock tunnel with expected high water pressures. While Slurry Shield tunneling has a long history of addressing this problem, this method has not always been problem-free and can prove costly. At recent projects around the world, two other methods have proven themselves in hard rock under water pressure: Shielded, Non-Continuous Pressurized (NCP)-TBM tunneling in rock with a comprehensive grouting program, or sequential advance in EPB mode. Both types of tunneling operations have proven themselves safe and cost-effective. In this paper, the authors will analyze machine design and grouting methodology of NCP tunneling using shielded TBMs at projects in the U.S., India, and more and compare these with projects using Slurry Shield TBMs in rock under high water pressures. Recommendations and guidelines will be given in order to establish a clear picture for contractors, consultants and owners to choose the most effective, safest and lowest cost method in these difficult tunneling conditions.

More details

0,00 €

Year 2022
City Copenhagen
Country Denmark
ISBN 978-2-9701436-7-3