Search & filter
Search & filter
Research and Application of Early Warning Method for Shield Machine Tail Seal
ITA-AITES World Tunnel Congress, WTC2022 and 48th General Assembly Bella Center, Copenhagen 2 - 8 September 2022 Research and Application of Early Warning Method for Shield Machine Tail Seal N. Wang1, X.L. Wei1, F.L. Lin1, J. Zhang1 1 China Railway Engineering Equipment Co., Ltd. Zhengzhou, Henan, China E-mail: shijiesuidaodahui@163.com Abstract: Aiming at the construction risks such as water leakage and grout leakage in the tail seal system of the shield machine, this paper analyzes the water leakage and collapse accident of Guangdong Foshan Metro project in detail, and proposes a comprehensive early warning method for the safety of tail seal based on a variety of front -end sensing technologies. Based on the integrated development of front-end sensors such as peripheral pressure, grouting pressure, tail brush cavity state and tail gap, the front-end sensing monitoring network is established, through which the monitoring data are displayed in the HMI in real time and is applied to the metro project in Hangzhou city. In addition, combined with the tail brush sealing capacity parameters, seal leakage criteria, this paper also elaborates the tail seal safety comprehensive early warning method. The risk level of shield tail seal is also generated in the practical application to ensure the construction safety. Key words: tail seal; grouting pressure; tail gap; peripheral pressure; comprehensive early warning upon analysis, this accident was the result of the combination 1.Recipient :
* Required fields
or Cancel
Research_and_Application_of_Earl
J. Zhang / X.l. Wei / F.l. Lin / N. Wang
This product is no longer in stock
Availability date: