Search & filter
Search & filter
Viewed documents
Accessibility, Circulation and Evacuation Plan Phase 1
The Buenos Aires Metro consist of six lines -A, B, C, D, E and H- that extend approximately 63 km underground and have 90 operational stations. The subway authorities decided to increase the interconnection capacity between lines B, C and D. This paper focuses on stages I and II of the first phase of the extension program, which involve: the construction of a shallow tunnel on soft soil that connects the stations of lines C and D, both located at the center of the city; and the construction of an access building that overlies the line C station and aims to interconnect the three lines stations at surface. The details of the project, it's interaction with the existing tunnels and the as-built configuration of the structures are presented and discussed.Recipient :
* Required fields
or Cancel
Accessibility_Circulation_-_Evac
This product is no longer in stock
Availability date: