Search & filter
Search & filter
Challenges in Design and Construction of Bangkok MRT Orange Line Project
The MRT construction works in Bangkok are more complicated than works in earlier projects. As the tunnel alignment passes through the congested urban areas in the city, it either clashes with or passes beneath several pre-existing structures. Underpinning works are then required. Assessment of movement of ground and structure plays an important role in the project. Besides, the rebound of piezometric pressure in sand layers that is being developed poses another major point of difficulty in the excavation and underground structure design and construction. Groundwater control measures become a crucial issue in MRT Orange Line project that leads to difficulties in deep MRT station excavations. To control base instability, various methods (e.g. cut-off wall, staged excavation) are introduced and presented in this paper.
Recipient :
* Required fields
or Cancel
id627
N. Phien-Wej / P. Kitiyodom / S. Laophulsuk / P. Prom-In / W. Suwasin / W. Wiriyatharakij
This product is no longer in stock
Availability date: