Waterview Connection Project Cross Passage Tunnels: Safety in Design and Construction

Waterview Connection Project Cross Passage Tunnels: Safety in Design and Construction

887_waterview_connection_project

W. Okada / A. Giauque / R. Bhargava

The Waterview Connection is the final 5 km link to complete the NZ Transport Agency’s Western Ring Route motorway around Auckland. The Waterview Connection is the largest and most complex roading infrastructure project ever undertaken in New Zealand. A 14.4m outside diameter EPB TBM was used to complete the twin 2.4 km long tunnel, located at the heart of the scheme. The Well-Connected Alliance delivering the project recognised the importance of identifing and mitigating hazards throughout all phases of the project. As a result, a rigorous safety-in-design procedure was mandated for all design packages so that safety risks were designed out wherever possible. The risk mitigation measures were implemented in construction works with multiple verification mechanisms in place.This paper describes key design and construction safety-in-design features that were developed for the sixteen cross passages linking the two main line tunnels. Such measures included a clear and robust safe man entry procedure for working under green shotcrete, excavation and lining geometry optimised for risk mitigation, extensive shotcrete trials designed for requisite early strength gain and all anticipated conditions, canopy tube ground support and targetted grouting in high permeability zones. Safe benched excavation sequencing was adopted to address the confined nature of the relatively small, short cross passage tunnels. Critical construction activities were monitored with instrumentation to ensure safety of personnel at all times. This case study provides the learnings from the safety in design and construction, which set a benchmark for the industry practice. The Waterview Connection cross passage tunnels were all successfully completed on time without any accidents or lost time injury.

More details

0,00 €

Year 2018
City Dubai
Country United Arab Emirates