Search & filter
Search & filter
Viewed documents
Singular portals - Yanango Tunnel
The excavation and reinforcement of the portals is the first phase in the construction of tunnels. Both the topography as well as the geology of the area should be taken into consideration when designing the portals, addressing a series of specific problems different to that of the excavation of the tunnels. The construction of the portals in mountainous environments, with steep slopes and small areas to work, can result in the excavation of large clearings that can negatively affect the overall stability of the slope in the long term. This creates the need to adapt the portal designs to each specific situation, ensuring long-term stability of the excavation and trace criterions. Thus, in this paper, various real cases of excavations in areas with very poor terrain and hillside excavations will be presented with design solutions that were different than those used normally.Recipient :
* Required fields
or Cancel
15028_construction_of_portals_in
S. Sanchez Rodriguez / M. Prieto Domínguez / E. V. Silva Espiña
This product is no longer in stock
Availability date: