Design and construction of The San José Hydroelectric Project (Cochabamba, Bolivia)

Design and construction of The San José Hydroelectric Project (Cochabamba, Bolivia)

wtc2015_fullpaper_torrico-2

A.Torrico / I. López / R. Páramo / S. Sánchez

The San José Hydropower Project (Cochabamba department, Bolivia) owned by ENDE Corporation and managed by the Public Agency CORANI comprises 2 power stations (San José 1 and San José 2) with a total capacity of 55 + 69 MW. The project is now under construction phase and includes 3 supply tunnels and 2 headrace tunnels with a total length of 15.7 km that shall be bored by NATM concept. To speed up construction 7 adits (2.7 km of total length) shall be bored. Additionally 9 shafts (intakes and surge tanks) are included in the design of the plant. With a maximum overburden of 580 m, soft sedimentary rocks with potential squeezing risk shall be bored. Great number of ‘Quebradas’, streams and rivers associated with faulted and fractured ar-eas are being crossed with great problems of water leakage.

More details

0,00 €

Year 2015
City Dubrovnik
Country Croatia