Search & filter

Search for a publication

Search & filter

Year

Author

City

Country

Koralmbahn-Challenges and solution concepts for the realization of the lot KAT 3 of the Koralm Tunnel with a major focus on different geological conditions with reference to the specification of the shield machine

Koralmbahn-Challenges and solution concepts for the realization of the lot KAT 3 of the Koralm Tunnel with a major focus on different geological conditions with reference to the specification of the shield machine

wtc2015_extendedfullpaperimm

K. Schneider / A. Kiesling / D. Handke

The Koralmbahn is one of the largest rail infrastructure projects in Europe. It is an essential key project in the Baltic Adriatic Axis within the Trans-European Networks. The Koralmbahn crosses the Alps in the east over a distance of 127 km in the south-eastern part of Austria. The double- track electrified new line is established for a maximum line speed of 250 km/h and includes 15 stations and eleven tunnels including the twin-tube Koralm Tunnel with a total length of 32.9 km. With the award of the construction works for the last of three construction lots (KAT 1-3) of the Koralm Tunnel, a further decisive step towards the realization has been completed.

More details

0,00 €

Year 2015
City Dubrovnik
Country Croatia