Search & filter
Search & filter
Koralmbahn-Challenges and solution concepts for the realization of the lot KAT 3 of the Koralm Tunnel with a major focus on different geological conditions with reference to the specification of the shield machine
The Koralmbahn is one of the largest rail infrastructure projects in Europe. It is an essential key project in the Baltic Adriatic Axis within the Trans-European Networks. The Koralmbahn crosses the Alps in the east over a distance of 127 km in the south-eastern part of Austria. The double- track electrified new line is established for a maximum line speed of 250 km/h and includes 15 stations and eleven tunnels including the twin-tube Koralm Tunnel with a total length of 32.9 km. With the award of the construction works for the last of three construction lots (KAT 1-3) of the Koralm Tunnel, a further decisive step towards the realization has been completed.Recipient :
* Required fields
or Cancel
wtc2015_extendedfullpaperimm
K. Schneider / A. Kiesling / D. Handke
This product is no longer in stock
Availability date: