First experiences gained with the hybrid EPB technology in the Rio de Janeiro sands

First experiences gained with the hybrid EPB technology in the Rio de Janeiro sands

firstexperiencesinnovativehybrid

M. Comulada / C. H. Turolla Maia / U. Maidl / A. Mahfuz / A. Coutinho

The shield-driven tunnel of Metro Rio Line 4 between the General Osório II and Gávea stations has an approximate length of 5.2 km. The double-track tunnels have an internal diameter of 10.33 m with a 0.40 m thick segmental lining. The excavation is carried out using an Earth Pressure Balanced shield with an excavation diameter of 11.53 m.