Search & filter

Search for a publication

Search & filter

Author

List of products by author: D. Clostermann

Showing 1 - 1 of 1 document
  • Read more
    0,00 €

    Abstract: An approx.. 740 m long trough and tunnel construction is to be built at the intersection „Autobahnkreuz Herne“. The new route crosses a railway embankment. The 60 m long tunneling through the railway embankment is to be executed with a protection of a piperoof. The piperoof consists of 21 steelpipes (d=1,6 m). The pipe jacking was proceeded „under rolling wheel“ with an overburden of only 2,5m....

    0,00 €
Showing 1 - 1 of 1 document