Search & filter
Search & filter
Abstract: Uma Oya Multipurpose Development Project involves 2 RCC Dams connected by a D&B Link tunnel which will transferred water from first dam to the 2nd dam and then it will be transferred conveyance a 15.4 km Headrace Tunnel to the top of a 618 m deep pressure shaft that feeds to an underground powerhouse for generation of electricity. The Headrace and Tailrace Tunnels are being excavated by two 4.4...