Search & filter

Search for a publication

Search & filter

Author

List of products by author: S. Rossetto

Showing 1 - 1 of 1 document
  • Read more
    0,00 €

    Abstract: Metro Milan line 2 was built in 1967 without considering waterproofing details. In late 90’s water table rose by many meters in a matter of a few years. Subsequently high rates of water inflow were observed in the tunnels. For instance, in 2015 the rate measured in the Lambrate-Piola Tunnels was up to 700m³/hour. Several attempts carried out with cementitious or resin injections were...

    0,00 €
Showing 1 - 1 of 1 document