Search & filter
Search & filter
Abstract: Tunnel design requires increasingly numerical analysis in order to provide densely scattered predictions about settlements along the project. For this reason, simple but reliable methods should be used. Contraction rate method meets the requirements: a low number of parameters is necessary and analysis can be made in only one calculation phase. These parameters depend on the geotechnical...