Abstract: In civil tunneling time and cost are closely related, the contractors usually run their projects with time reduction as a major target. However, keeping the excavated tunnel profile as close as possible to the desired plan is equally important, thus minimizing extra cost and the risk of penalties. When the tunnel profile shape or size changes, or when rock...