Search & filter
Search & filter
Abstract: Tunnelling excavation might lead to surface structural damages due to settlement occurrence. Therefore, maximum settlement must be evaluated as accurate as possible before tunnelling excavation. In this investigation, an Expert Settlement Evaluation Model (ESEM) has been developed by using Case-Based Reasoning (CBR) method to evaluate maximum settlement occurred by tunnelling activities. This...