Search & filter
Search & filter
Abstract: The pipe jacking method across the river is suitable under the condition of the good geological condition and the low water pressure for the straight line jacking method. There is no longitudinal curve pipe jacking across the rivers for the steep slope in China. The length of the Fu Chun River pipe jacking tunnel is 658.05m in total. The water pressure is high, the slope is steep, and the...