Search & filter
Search & filter
Abstract: Lot Mules 2-3 is the main segment of BBT (Brenner Base Tunnel) on Italian Side. The paper illustrates the activities forecasted in Detailed Design (performed by the Designer Joint Venture: Pro Iter – leader, Pöyry Schweiz, Pini Swiss Engineers and Pasquali Rausa Engineering) and carried out during construction, to compare the design assumptions to the actual behavior of both the rock mass and...