Search & filter
Search & filter
Abstract: In mechanized tunnelling a so-called annular gap with a width of up to 20 cm remains between the segment lining and the surrounding soil. Soon after mounting of the segment rings, the annular gap must be filled with an adequate grouting mortar to stabilize the tunnel lining and to minimize settlements of the ground surface. Thereby, two contradictory requirements are demanded on such annular...