Abstract: During the excavation of the exploratory tunnel and the two cavities for the construction of the Brenner Base project through a particularly fault-ridden area, an intensive monitoring system was installed on the consolidation and support elements.This instrumentation measured the deformations of the excavated rock mass, the stresses induced by the excavation on the structures and the stress...
Abstract: The Brenner Base Tunnel (BBT) runs for 64 km between Austria and Italy, making it the longest underground railway tunnel in the world. The BBT consists of two single-track tubes, cross passages every 333 m, an exploratory tunnel, and three emergency stops. The planning is underway since 1999, and construction began in 2007. More than half of a total 230 km of tunnel construction including 80%...