Abstract: The paper presents the application of the “A.DE.CO-RS Approach” for the construction of “Višňové Tunnel” in D1 Motorway. It is a double lane tunnel of the D1 Motorway “Lietavská Lúčka – Višňové – Dubná Skala”, about 7450 m length. It’s located in the Žilina district of Slovakia. In a Yellow FIDIC contract, the JV Salini Impregilo–DUHA proposed to the Client a variation of the excavation...