Search & filter
Search & filter
Abstract: This paper describes how tunnelling in urban areas poses challenges with respect to structural noise and risk of limited TBM operation time. The ongoing construction of the tunnel section of The Follo Line Project requires many considerations as the tunnel boring machines work their way through several densely populated areas with occasional limited overburden. The structural noise generated by...