Search & filter
Search & filter
Abstract: Trabzon City Pass Kanuni Boulevard project is approximately 23 km long and 9 tunnels will be opened in the scope of this project. The first tunnel to be opened is Akyazı tunnel. Left tube is located between Km: 0+764-3+180 (2416m long); right tube is located between Km: 0+764- 3+242 (2478 m long), and this tunnel is designed as twin tube having 3-lanes (Fig. 1). Project alignment enters the...