Search & filter
Search & filter
Abstract: The main tunnels of the Follo Line Project will be built by shielded TBMs using a water tight segmental lining, while the most of the cross passages are foreseen to be drained. The segment ring and the collar, which supports the opening of the segmental lining, will constitute an undrained lining, but the ground water pressure in the rock mass around will be modified by the water flow towards...