Search & filter
Search & filter
Abstract: Venda Nova III repowering project is an underground hydropower scheme. Its hydraulic circuit comprises, inter alia, an upstream surge tank, which aims to dissipate hydraulic transients due to turbine and pumping operations. This upstream surge tank consists of a main shaft, an expansion chamber, a lower chamber and two vertical shafts connecting to the headrace tunnel. The two vertical surge...