Search & filter
Search & filter
Abstract: Vibration mitigation of a drill and blast excavation is one of the main issues in urban tunneling, and various preventive techniques have been tried so far. A pre-cut excavation method introduced in Lee, . (2016) is an alternative to reduce the blasting vibration although the preparation time of the additional cut should be shortened in field application. Another technique was investigated in...