Search & filter
Search & filter
Abstract: This paper presents a detailed evaluation of airport runway settlement behavior during construction of passenger terminal connecting railway twin tunnels (1,150 m long) by 7.9 m diameter EPB shield TBM in soft ground. The instrumented settlement data are analyzed to evaluate the surface settlement trough occurred by TBM tunneling. The maximum settlement is controlled within about 25 mm at the...