List of products by author: G. Peach

Showing 1 - 5 of 5 documents
  • Read more
    0,00 €

    Abstract: Twin 8.5 m diameter, 10.5 km long parallel headrace tunnels under overburdens of up to 1 870 m with high horizontal stresses were excavated for the Neelum Jhelum Hydroelectric Project located in the Azad Kashmir region of northeast Pakistan using two main beam gripper Tunnel Boring Machines (TBMs). The TBMs were introduced to improve tunnel excavation rates and were the only realistic...

    0,00 €
  • Read more
    0,00 €

    Abstract: Tunnelling can be said to unite theory and practice into its own construction art. With this in mind, it is impossible for designers of tunnel linings to disassociate themselves from the practical construction aspects of excavation and installation of support. This paper provides guidance for designers of rock support and linings for tunnels excavated with hard rock open gripper Tunnel Boring...

    0,00 €
  • Read more
    0,00 €

    Abstract: Twin 8.5 m diameter, 10 km long parallel headrace tunnels under overburdens of up to 1 870 m with high horizontal stresses were excavated for the Neelum Jhelum Hydroelectric Project located in the Azad Kashmir region of northeast Pakistan using two main beam gripper Tunnel Boring Machines (TBMs). Both TBMs started headrace tunnel excavation in early 2013 with completion by the first TBM in...

    0,00 €
  • Read more
    0,00 €

    Abstract: Rockbursts in the tight confines of a TBM tunnel can be highly hazardous events given the proximity of vital equipment and workers to the rockburst source, and the space constraints that severely limit employment of countermeasures. Consequently, the ability to predict rockbursts with some measure of confidence as excavation proceeds (i.e. in the ‘short-term’) is critical to the safety of both...

    0,00 €
  • Read more
    0,00 €

    Abstract: Musaimeer outfall tunnel is one of the longest storm water tunnels in the world with a total length of 10.2 km. The tunnel will accommodate surface and storm water received from the drainage networks from 270 km² of urban areas in southern Doha. The tunnel was excavated by Tunnel Boring Machine (TBM) and encountered three distinct rock masses Rus formation, Midra-Shale and Simsima Limestone...

    0,00 €