Search & filter
Search & filter
Abstract: When creating an opening in a sidewall of an existing cut-and-cover tunnel, safety verification should be carried out for fear of decrease in rigidity of the node connecting the upper slab and the sidewall. The decrease in the rigidity of the node connecting the upper slab and the sidewall results in an increase in vertical displacement along the upper slab span, and for this reason, the inner...