Search & filter
Search & filter
Abstract: During the excavation of the underground powerhouse complex a shear/fracture zone of approximate 8m thickness, intersecting both the caverns was encountered. Presence of the shear zone necessitated detailed rock mechanics studies for re-evaluation of excavation methodology and support system. To ensure the stability of the caverns and efficacy of the revised support system numerical modeling...