Abstract: In TBM tunnelling, the connection of the mainline tunnel with cross-passages (cp) is typically realised upon finalisation of the tunnel drive. In this temporary construction stage, the precast segmental lining is being opened by removing segments in the opening area. In order to continuously support and stabilise the remaining segment rings, segments have to be equipped with load-transfer...
Abstract: In the course of the extension of the new railway line Wendlingen-Ulm, the Boßler Tunnel is to be excavated in planning approval section 2.2 "Albaufstieg", as a two-tube, single-jacket tunnel with a length of 8.806 m between Aichelberg and Mühlhausen. The contract for the construction of the new high-speed road was awarded to the working group "Tunnel Albaufstieg" by the Deutsche Bahn...