Abstract: During the design of the Gotthard Base Tunnel a lot of time was spent to determine the rock conditions that were to be expected and the corresponding requirements for the open gripper TBM. Naturally these investigations focussed on the reachable advance rates and the respective costs. In the meantime the excavation is finished, the concrete works completed, the railway components are installed...