Search & filter
Search & filter
Abstract: The paper presents the design and research efforts made to successfully construct a rail tunnel which under crossing oblique (60˚) a highway with six-lane and with as little as 2,70 - 3.30m of cover. Geotechnical parameters, tunnelling method selection, construction phases and three-dimensional finite element analyses with ground response and monitoring are discussed. The selected method was...