Search & filter
Search & filter
Abstract: The tunnel excavations in Uskudar-Umraniye-Cekmekoy metro construction project conducted by the Istanbul Metropolitan Municipality Department of Rail Systems, Directorate of Rail Systems on Asian Side, are executed by using both NATM and TBM excavation methods. Platforms, scissor crossing tunnels, transportation tunnels, link tunnels and ladder tunnels that have various cross sections are...
Abstract: The tunnel excavations in Uskudar-Umraniye-Cekmekoy metro construction project conducted by the Istanbul Metropolitan Municipality Department of Rail Systems, Directorate of Rail Systems on Asian Side, are executed by using both NATM and TBM excavation methods. Platforms, scissor crossing tunnels, transportation tunnels, link tunnels and ladder tunnels that have various cross sections are...
Abstract: Within the scope of the Uskudar-Umranıye-Cekmekoy metro construction project conducted by the Istanbul Metropolitan Municipality Department of Rail Systems, Directorate of Rail Systems on Asian Side tunnel excavations are performed by using both NATM and TBM excavation methods. Platform, scissors crossing tunnel, transportation, connecting and ladder tunnels are excavated with NATM method...