Search & filter
Search & filter
Abstract: The Port Miami Tunnel project in Florida, USA, involved construction of twin-bore, 12.9 m diameter, 1.3 km long tunnels through challenging ground conditions comprising a variable sequence of limestone and sand layers, including a highly porous, coarsely graded coralline limestone with high permeability and groundwater pressures. Effective conditioning of the excavated soil/rock materials was...