Search & filter
Search & filter
Abstract: The widening excavation of the small diameter inclined tunnels was planned with the hydraulic wedges. The reconstruction works has to be executed on the very old hydropower station and mining technique is not approved. Because excavation method with wedges was useless, the pre- splitting of the rock mass was wire saw was applied to executed widening excavation of tunnels. The unforeseen...