Search & filter
Search & filter
Abstract: The design process of a segmental tunnel lining requires a correct identification of all loads acting on the precast concrete segments, both during construction as well as throughout the lifetime of the structure. The application of strain and ovalisation measurements during and after construction of the Liefkenshoek rail tunnel in Belgium has shown that the actions corresponding to the early...