Search & filter
Search & filter
Abstract: The São Paulo Metro line 5 involves different typical construction methods for the stations: cut&cover (in the configuration bottom-up and top-down), mined underground stations excavated with the NATM, multi-secant large diameter shafts. Special constraints at the Brooklin station site of the São Paulo Metro line 5 (polluted multilevel aquifers, reduced spaces for the construction site,...