Search & filter
Search & filter
Abstract: The objective of this document is to present the structural analysis and design calculations for the initial lining of the the enlarged portion of the tunnels sections called bifurcations. combination of rib elements and NATM tunneling stages was chosen as the design method for bifurcations in the Niayesh tunnel.The scope of this document is the finite element analysis of the soil construction...