Abstract: Apart from development in machine technology and other cross sectional tunnel shapes, the alternative lining systems. It has carried out as well, in early sixties in the former Soviet Republic experiments were carried out with tunnel lining without any joints [1] after excavation; the soil was replaced by in site poured concrete lining. At the end of the seventies and beginning of the eighties...
Abstract: This paper discusses a very unique research including the design and testing of the compressible type gaskets for steel segments, which has not been studied much in the field of the TBM tunneling. Over the course of developing the design of segments of steel rings or flexible rings of the bored tunnels for Eurasia Tunnel, it was discovered that gaskets do not have sufficient space to expand...
Abstract: The Metro Line 4 of phase 1 passes through about 17.0 km underground, it had to choose in the design between a few alternative solutions due to the tight implementation time schedule, the route. The selected solution was to reduce the level of the alignment by excavating and breaking through the two groups of working piles under the main street, which is the...