Search & filter
Search & filter
Abstract: For the immersed tunnel element installation in shallow waters,it is very important to provide automatically positioning solution of high accuracy and reliability to guarantee the safety of construction. Therefore, a precise positioning method is studied in this paper. First of all, a comprehensive monitoring system, which is composed of survey towers, total stations, GPSs, MRUs, compasses and...
Abstract: Based on the engineering background of a single-arch large-span prefabricated subway station in Changchun, a three-dimensional numerical model of the fabricated structure and cast-in-place structure considering soil-structure interaction was established. The seismic time history analysis showed that the fabricated structure had excellent resistance to deformation and better mechanical...