Search & filter
Search & filter
Abstract: The new Line 3 of Santiago Metro includes the construction of the University of Chile Station, just beneath the existing track tunnel of Line 1. A reliability study was carried out to assess the probability of failure of tunnel excavation for the new station. The stability analyses were performed using the analytical solutions by Mühlhaus (1985) and by Anagnostou and Kovári (1994). The...